Dear all,
this is an update of our status today and our pending tasks.
*3rd Newsletter: *solution required from FSFE by 11.07.19 (Only OFE, FSFE inserted texts in Keybase folder).
*Peer Review of** O2/A1 Training Plan: *OFE by 12.07.
*Feasibility study:* by OFE 12.07.
*Peer Review FSFE: *relevant templates need to be saved in Keybase for both reviewed documents (Training Plan and Platform Design Plan) by 12.07.
*Clone of training course*: ATL by 12.07
*O3/A2 - 01.05.-30.07.19 - Report and consultation: *OFE by 16.07.
*O3/A2 **Peer Review*: ATL, Dlearn by 17-31.07.19.
*O2/A2 Translation of Training Course contents: *all relevant partners by 30.07
*O2/A2 Mother tongue videos*: Greek ok. rest by 31.07. by Peter/ TUD.
*O2/A2 Import of translations in Moodle – finalisation of courses*: all relevant partners by 16.08. (Guidelines provided as attachment).
*O2/A4*: all partners ASAP in their country. Multiplier events. Results of our O2/A4 should be ready before our meeting in Brussels.
*TU Dublin Invoice*: TUD to reply ASAP. payment still pending.
*Certificates of participation – Dublin Meet.:* Pending from TUD. ASAP.
*Stakeholders Matrix*: SKUNI[KT1] <#_msocom_1> , TUD[KT2] <#_msocom_2> should insert 25 entries in the table. ASAP.
*O1/A2 executive summary translation: *File “FOSS4SMEs_ IO1.A2 Executive Summary”, Translations to be provided by Dlearn, FSFE, and SKUNI in K:\team\foss4smes\2. Implementation\Outputs\Output 1\A2\O1.A2. Summary translations by 01.09.19.
*O3/A1 executive summary translation: *Dlearn, FSFE, ATL and SKUNI by *01.09.19.* in folder K:\team\foss4smes\2. Implementation\Outputs\Output 3\A1\Translated executive summaries
*Timesheets 07-09.19: All* by 20.9. ------------------------------
[KT1] <#_msoanchor_1>to be able to provide contacts for the stakeholders matrix) we stress the importance of providing content for use under usage scenario 3
[KT2] <#_msoanchor_2>We were working on this in conjunction with our multiplier event so I will get a list from our internal admin
Thank you all for our cooperation. Please remember to inform me on your summer leave. I will be away 01-20.08.19, but will have access to all communication channels we use.
Best, Katerina
Dear Katerina,
Thank you for the always helpful overview of the current project status. I've done the peer review of the training plan and uploaded it into the respective folder. I am working on the feasibility study and the policy recommendation report, yet I will at least an additional week to complete these deliverables. A consultation has been sent out and will be included in the final deliverable. Apologies for the delay. Best, Sivan
-- Sivan Pätsch (he/him) Digital Policy Adviser OpenForum Europe tel +32 (0) 2 486 4151 mob +32 (0) 484 90 71 23 web http://www.openforumeurope.org (http://www.openforumeurope.org/) Follow us on Twitter @OpenForumEurope (https://twitter.com/OpenForumEurope) -- OpenForum Europe AISBL Registered office: Avenue des Arts 56, Brussels 1000, Belgium On Jul 10 2019, at 9:23 am, Katerina Tsinari tsinari@abe.gr wrote:
Dear all,
this is an update of our status today and our pending tasks.
3rd Newsletter: solution required from FSFE by 11.07.19 (Only OFE, FSFE inserted texts in Keybase folder). Peer Review of O2/A1 Training Plan: OFE by 12.07. Feasibility study: by OFE 12.07. Peer Review FSFE: relevant templates need to be saved in Keybase for both reviewed documents (Training Plan and Platform Design Plan) by 12.07. Clone of training course: ATL by 12.07 O3/A2 - 01.05.-30.07.19 - Report and consultation: OFE by 16.07. O3/A2 Peer Review: ATL, Dlearn by 17-31.07.19. O2/A2 Translation of Training Course contents: all relevant partners by 30.07 O2/A2 Mother tongue videos: Greek ok. rest by 31.07. by Peter/ TUD. O2/A2 Import of translations in Moodle – finalisation of courses: all relevant partners by 16.08. (Guidelines provided as attachment). O2/A4: all partners ASAP in their country. Multiplier events. Results of our O2/A4 should be ready before our meeting in Brussels. TU Dublin Invoice: TUD to reply ASAP. payment still pending. Certificates of participation – Dublin Meet.: Pending from TUD. ASAP. Stakeholders Matrix: SKUNI[KT1] (#_msocom_1) , TUD[KT2] (#_msocom_2) should insert 25 entries in the table. ASAP. O1/A2 executive summary translation: File “FOSS4SMEs_ IO1.A2 Executive Summary”, Translations to be provided by Dlearn, FSFE, and SKUNI in K:\team\foss4smes\2. Implementation\Outputs\Output 1\A2\O1.A2. Summary translations by 01.09.19. O3/A1 executive summary translation: Dlearn, FSFE, ATL and SKUNI by 01.09.19. in folder K:\team\foss4smes\2. Implementation\Outputs\Output 3\A1\Translated executive summaries Timesheets 07-09.19: All by 20.9. [KT1] (#_msoanchor_1)to be able to provide contacts for the stakeholders matrix) we stress the importance of providing content for use under usage scenario 3 [KT2] (#_msoanchor_2)We were working on this in conjunction with our multiplier event so I will get a list from our internal admin
Thank you all for our cooperation. Please remember to inform me on your summer leave. I will be away 01-20.08.19, but will have access to all communication channels we use.
Best, Katerina
--
Foss4smes-team mailing list Foss4smes-team@lists.fsfe.org https://lists.fsfe.org/mailman/listinfo/foss4smes-team
This mailing list is covered by the FSFE's Code of Conduct. All participants are kindly asked to be excellent to each other: https://fsfe.org/about/codeofconduct
Dear Sivan,
thank you for your feedback. TUD can now proceed with the update of the file (by 26.07.19). Please save the two files you are preparing in Keybase by *18.07 *at least. We cant delay the dates planned for the Peer Review. You will then have again time to finalise and improve them further after the review process.
Thank you in advance.
Best, Katerina
Στις Τετ, 10 Ιουλ 2019 στις 6:37 μ.μ., ο/η Sivan Pätsch < sivan@openforumeurope.org> έγραψε:
Dear Katerina,
Thank you for the always helpful overview of the current project status.
I've done the peer review of the training plan and uploaded it into the respective folder.
I am working on the feasibility study and the policy recommendation report, yet I will at least an additional week to complete these deliverables. A consultation has been sent out and will be included in the final deliverable. Apologies for the delay.
Best, Sivan
-- *Sivan Pätsch* (he/him) Digital Policy Adviser OpenForum Europe tel +32 (0) 2 486 4151 mob +32 (0) 484 90 71 23 web http://www.openforumeurope.org Follow us on Twitter @OpenForumEurope
https://twitter.com/OpenForumEurope
OpenForum Europe AISBL Registered office: Avenue des Arts 56, Brussels 1000, Belgium On Jul 10 2019, at 9:23 am, Katerina Tsinari tsinari@abe.gr wrote:
Dear all,
this is an update of our status today and our pending tasks.
*3rd Newsletter: *solution required from FSFE by 11.07.19 (Only OFE, FSFE inserted texts in Keybase folder).
*Peer Review of* *O2/A1 Training Plan: *OFE by 12.07.
*Feasibility study:* by OFE 12.07.
*Peer Review FSFE: *relevant templates need to be saved in Keybase for both reviewed documents (Training Plan and Platform Design Plan) by 12.07.
*Clone of training course*: ATL by 12.07
*O3/A2 - 01.05.-30.07.19 - Report and consultation: *OFE by 16.07.
*O3/A2 Peer Review*: ATL, Dlearn by 17-31.07.19.
*O2/A2 Translation of Training Course contents: *all relevant partners by 30.07
*O2/A2 Mother tongue videos*: Greek ok. rest by 31.07. by Peter/ TUD.
*O2/A2 Import of translations in Moodle – finalisation of courses*: all relevant partners by 16.08. (Guidelines provided as attachment).
*O2/A4*: all partners ASAP in their country. Multiplier events. Results of our O2/A4 should be ready before our meeting in Brussels.
*TU Dublin Invoice*: TUD to reply ASAP. payment still pending.
*Certificates of participation – Dublin Meet.:* Pending from TUD. ASAP.
*Stakeholders Matrix*: SKUNI[KT1] <#m_3797198707834686741__msocom_1> , TUD [KT2] <#m_3797198707834686741__msocom_2> should insert 25 entries in the table. ASAP.
*O1/A2 executive summary translation: *File “FOSS4SMEs_ IO1.A2 Executive Summary”, Translations to be provided by Dlearn, FSFE, and SKUNI in K:\team\foss4smes\2. Implementation\Outputs\Output 1\A2\O1.A2. Summary translations by 01.09.19.
*O3/A1 executive summary translation: *Dlearn, FSFE, ATL and SKUNI by *01.09.19.* in folder K:\team\foss4smes\2. Implementation\Outputs\Output 3\A1\Translated executive summaries
*Timesheets 07-09.19: All* by 20.9.
[KT1] <#m_3797198707834686741__msoanchor_1>to be able to provide contacts for the stakeholders matrix) we stress the importance of providing content for use under usage scenario 3 [KT2] <#m_3797198707834686741__msoanchor_2>We were working on this in conjunction with our multiplier event so I will get a list from our internal admin
Thank you all for our cooperation. Please remember to inform me on your summer leave. I will be away 01-20.08.19, but will have access to all communication channels we use.
Best, Katerina
--
Foss4smes-team mailing list Foss4smes-team@lists.fsfe.org https://lists.fsfe.org/mailman/listinfo/foss4smes-team
This mailing list is covered by the FSFE's Code of Conduct. All participants are kindly asked to be excellent to each other: https://fsfe.org/about/codeofconduct
Dear Katerina & Francesco,
The Draft Policy Recommendation Report (v1) and exploitation plan with the added part on feasibility (v3) are now available in the below folders. As said during the call today, the output is very much in draft state. /foss4smes/2. Implementation/Outputs/Output 3/A2/ foss4smes/1. Management/A13 Exploitation Plan/
Best, Sivan
-- Sivan Pätsch (he/him) Digital Policy Adviser OpenForum Europe tel +32 (0) 2 486 4151 mob +32 (0) 484 90 71 23 web http://www.openforumeurope.org (http://www.openforumeurope.org/) Follow us on Twitter @OpenForumEurope (https://twitter.com/OpenForumEurope) -- OpenForum Europe AISBL Registered office: Avenue des Arts 56, Brussels 1000, Belgium On Jul 11 2019, at 2:48 pm, Katerina Tsinari tsinari@abe.gr wrote:
Dear Sivan,
thank you for your feedback. TUD can now proceed with the update of the file (by 26.07.19). Please save the two files you are preparing in Keybase by 18.07 at least. We cant delay the dates planned for the Peer Review. You will then have again time to finalise and improve them further after the review process.
Thank you in advance.
Best, Katerina
Στις Τετ, 10 Ιουλ 2019 στις 6:37 μ.μ., ο/η Sivan Pätsch <sivan@openforumeurope.org (mailto:sivan@openforumeurope.org)> έγραψε:
Dear Katerina,
Thank you for the always helpful overview of the current project status. I've done the peer review of the training plan and uploaded it into the respective folder. I am working on the feasibility study and the policy recommendation report, yet I will at least an additional week to complete these deliverables. A consultation has been sent out and will be included in the final deliverable. Apologies for the delay. Best, Sivan
-- Sivan Pätsch (he/him)
Digital Policy Adviser
OpenForum Europe
tel +32 (0) 2 486 4151 mob +32 (0) 484 90 71 23 web http://www.openforumeurope.org (http://www.openforumeurope.org/) Follow us on Twitter @OpenForumEurope (https://twitter.com/OpenForumEurope) -- OpenForum Europe AISBL Registered office: Avenue des Arts 56, Brussels 1000, Belgium
On Jul 10 2019, at 9:23 am, Katerina Tsinari <tsinari@abe.gr (mailto:tsinari@abe.gr)> wrote:
Dear all,
this is an update of our status today and our pending tasks.
3rd Newsletter: solution required from FSFE by 11.07.19 (Only OFE, FSFE inserted texts in Keybase folder). Peer Review of O2/A1 Training Plan: OFE by 12.07. Feasibility study: by OFE 12.07. Peer Review FSFE: relevant templates need to be saved in Keybase for both reviewed documents (Training Plan and Platform Design Plan) by 12.07. Clone of training course: ATL by 12.07 O3/A2 - 01.05.-30.07.19 - Report and consultation: OFE by 16.07. O3/A2 Peer Review: ATL, Dlearn by 17-31.07.19. O2/A2 Translation of Training Course contents: all relevant partners by 30.07 O2/A2 Mother tongue videos: Greek ok. rest by 31.07. by Peter/ TUD. O2/A2 Import of translations in Moodle – finalisation of courses: all relevant partners by 16.08. (Guidelines provided as attachment). O2/A4: all partners ASAP in their country. Multiplier events. Results of our O2/A4 should be ready before our meeting in Brussels. TU Dublin Invoice: TUD to reply ASAP. payment still pending. Certificates of participation – Dublin Meet.: Pending from TUD. ASAP. Stakeholders Matrix: SKUNI[KT1] (#m_3797198707834686741__msocom_1) , TUD[KT2] (#m_3797198707834686741__msocom_2) should insert 25 entries in the table. ASAP. O1/A2 executive summary translation: File “FOSS4SMEs_ IO1.A2 Executive Summary”, Translations to be provided by Dlearn, FSFE, and SKUNI in K:\team\foss4smes\2. Implementation\Outputs\Output 1\A2\O1.A2. Summary translations by 01.09.19. O3/A1 executive summary translation: Dlearn, FSFE, ATL and SKUNI by 01.09.19. in folder K:\team\foss4smes\2. Implementation\Outputs\Output 3\A1\Translated executive summaries Timesheets 07-09.19: All by 20.9. [KT1] (#m_3797198707834686741__msoanchor_1)to be able to provide contacts for the stakeholders matrix) we stress the importance of providing content for use under usage scenario 3 [KT2] (#m_3797198707834686741__msoanchor_2)We were working on this in conjunction with our multiplier event so I will get a list from our internal admin
Thank you all for our cooperation. Please remember to inform me on your summer leave. I will be away 01-20.08.19, but will have access to all communication channels we use.
Best, Katerina
--
Foss4smes-team mailing list Foss4smes-team@lists.fsfe.org (mailto:Foss4smes-team@lists.fsfe.org) https://lists.fsfe.org/mailman/listinfo/foss4smes-team
This mailing list is covered by the FSFE's Code of Conduct. All participants are kindly asked to be excellent to each other: https://fsfe.org/about/codeofconduct
--
Dear Sivan,
thank you for the hard work und understanding of the tight deadline. Francesco and I will upload our reviews by the end of July in the folder K:\team\foss4smes\2. Implementation\Outputs\Output 3\A2\Peer Review
Talk to you soon.
Best, Katerina
Στις Πέμ, 18 Ιουλ 2019 στις 9:15 μ.μ., ο/η Sivan Pätsch < sivan@openforumeurope.org> έγραψε:
Dear Katerina & Francesco,
The Draft Policy Recommendation Report (v1) and exploitation plan with the added part on feasibility (v3) are now available in the below folders. As said during the call today, the output is very much in draft state.
/foss4smes/2. Implementation/Outputs/Output 3/A2/ foss4smes/1. Management/A13 Exploitation Plan/
Best, Sivan
-- *Sivan Pätsch* (he/him) Digital Policy Adviser OpenForum Europe tel +32 (0) 2 486 4151 mob +32 (0) 484 90 71 23 web http://www.openforumeurope.org Follow us on Twitter @OpenForumEurope
https://twitter.com/OpenForumEurope
OpenForum Europe AISBL Registered office: Avenue des Arts 56, Brussels 1000, Belgium On Jul 11 2019, at 2:48 pm, Katerina Tsinari tsinari@abe.gr wrote:
Dear Sivan,
thank you for your feedback. TUD can now proceed with the update of the file (by 26.07.19). Please save the two files you are preparing in Keybase by *18.07 *at least. We cant delay the dates planned for the Peer Review. You will then have again time to finalise and improve them further after the review process.
Thank you in advance.
Best, Katerina
Στις Τετ, 10 Ιουλ 2019 στις 6:37 μ.μ., ο/η Sivan Pätsch < sivan@openforumeurope.org> έγραψε:
Dear Katerina,
Thank you for the always helpful overview of the current project status.
I've done the peer review of the training plan and uploaded it into the respective folder.
I am working on the feasibility study and the policy recommendation report, yet I will at least an additional week to complete these deliverables. A consultation has been sent out and will be included in the final deliverable. Apologies for the delay.
Best, Sivan
-- *Sivan Pätsch* (he/him) Digital Policy Adviser OpenForum Europe tel +32 (0) 2 486 4151 mob +32 (0) 484 90 71 23 web http://www.openforumeurope.org Follow us on Twitter @OpenForumEurope
https://twitter.com/OpenForumEurope
OpenForum Europe AISBL Registered office: Avenue des Arts 56, Brussels 1000, Belgium On Jul 10 2019, at 9:23 am, Katerina Tsinari tsinari@abe.gr wrote:
Dear all,
this is an update of our status today and our pending tasks.
*3rd Newsletter: *solution required from FSFE by 11.07.19 (Only OFE, FSFE inserted texts in Keybase folder).
*Peer Review of* *O2/A1 Training Plan: *OFE by 12.07.
*Feasibility study:* by OFE 12.07.
*Peer Review FSFE: *relevant templates need to be saved in Keybase for both reviewed documents (Training Plan and Platform Design Plan) by 12.07.
*Clone of training course*: ATL by 12.07
*O3/A2 - 01.05.-30.07.19 - Report and consultation: *OFE by 16.07.
*O3/A2 Peer Review*: ATL, Dlearn by 17-31.07.19.
*O2/A2 Translation of Training Course contents: *all relevant partners by 30.07
*O2/A2 Mother tongue videos*: Greek ok. rest by 31.07. by Peter/ TUD.
*O2/A2 Import of translations in Moodle – finalisation of courses*: all relevant partners by 16.08. (Guidelines provided as attachment).
*O2/A4*: all partners ASAP in their country. Multiplier events. Results of our O2/A4 should be ready before our meeting in Brussels.
*TU Dublin Invoice*: TUD to reply ASAP. payment still pending.
*Certificates of participation – Dublin Meet.:* Pending from TUD. ASAP.
*Stakeholders Matrix*: SKUNI[KT1] <#m_7129235712664354647_m_3797198707834686741__msocom_1> , TUD[KT2] <#m_7129235712664354647_m_3797198707834686741__msocom_2> should insert 25 entries in the table. ASAP.
*O1/A2 executive summary translation: *File “FOSS4SMEs_ IO1.A2 Executive Summary”, Translations to be provided by Dlearn, FSFE, and SKUNI in K:\team\foss4smes\2. Implementation\Outputs\Output 1\A2\O1.A2. Summary translations by 01.09.19.
*O3/A1 executive summary translation: *Dlearn, FSFE, ATL and SKUNI by *01.09.19.* in folder K:\team\foss4smes\2. Implementation\Outputs\Output 3\A1\Translated executive summaries
*Timesheets 07-09.19: All* by 20.9.
[KT1] <#m_7129235712664354647_m_3797198707834686741__msoanchor_1>to be able to provide contacts for the stakeholders matrix) we stress the importance of providing content for use under usage scenario 3 [KT2] <#m_7129235712664354647_m_3797198707834686741__msoanchor_2>We were working on this in conjunction with our multiplier event so I will get a list from our internal admin
Thank you all for our cooperation. Please remember to inform me on your summer leave. I will be away 01-20.08.19, but will have access to all communication channels we use.
Best, Katerina
--
Foss4smes-team mailing list Foss4smes-team@lists.fsfe.org https://lists.fsfe.org/mailman/listinfo/foss4smes-team
This mailing list is covered by the FSFE's Code of Conduct. All participants are kindly asked to be excellent to each other: https://fsfe.org/about/codeofconduct
--
Hi Katerina and all,
a few updates from my side:
* Contribution to the 3rd newsletter added. * Our multiplier event, as I wrote in the newsletter, has been already held in June. This was done because July and August are complicated months in Italy to get people participating to an event like ours (especially in Milan) due to the summer season, and there is no space in our agenda in September. By the way, the event was positive and the people attending had a good impression of our work so far. We showed in particular the ECVET competence profile and explained how the course will look like in its final versions (including the three usage scenarios foreseen). * Translation of the course units (IO2/A2): please note that the deadline indicated is not realistic, since we are still waiting for the file with the final and definitive version to be sent to our translators (we have exceptional costs allocated in our budget for it). Then, once received it, they will need approximately one month to do the work. Considering August and summer holidays, the translation of the course won’t be completed until mid-September at least. * My office will be closed for summer leave from 1 to 31 of August.
Thank you,
Francesco Agresta
European Project Manager
European Digital Learning Network
Via Domenico Scarlatti, 30
20124 Milano
Mob. +39 3496027623
Email mailto:francesco.agresta@dlearn.eu francesco.agresta@dlearn.eu
http://www.dlearn.eu/ www.dlearn.eu
Da: Foss4smes-team foss4smes-team-bounces@lists.fsfe.org Per conto di Katerina Tsinari Inviato: mercoledì 10 luglio 2019 09:23 A: FOSS4SMEs mailing list foss4smes-team@lists.fsfe.org Cc: Cosmas Vamvalis vamvalis@abe.gr Oggetto: [FOSS4SMEs-team] FOSS4SMEs: Project status 10.07.19
Dear all,
this is an update of our status today and our pending tasks.
3rd Newsletter: solution required from FSFE by 11.07.19 (Only OFE, FSFE inserted texts in Keybase folder).
Peer Review of O2/A1 Training Plan: OFE by 12.07.
Feasibility study: by OFE 12.07.
Peer Review FSFE: relevant templates need to be saved in Keybase for both reviewed documents (Training Plan and Platform Design Plan) by 12.07.
Clone of training course: ATL by 12.07
O3/A2 - 01.05.-30.07.19 - Report and consultation: OFE by 16.07.
O3/A2 Peer Review: ATL, Dlearn by 17-31.07.19.
O2/A2 Translation of Training Course contents: all relevant partners by 30.07
O2/A2 Mother tongue videos: Greek ok. rest by 31.07. by Peter/ TUD.
O2/A2 Import of translations in Moodle – finalisation of courses: all relevant partners by 16.08. (Guidelines provided as attachment).
O2/A4: all partners ASAP in their country. Multiplier events. Results of our O2/A4 should be ready before our meeting in Brussels.
TU Dublin Invoice: TUD to reply ASAP. payment still pending.
Certificates of participation – Dublin Meet.: Pending from TUD. ASAP.
Stakeholders Matrix: SKUNI[KT1] , TUD[KT2] should insert 25 entries in the table. ASAP.
O1/A2 executive summary translation: File “FOSS4SMEs_ IO1.A2 Executive Summary”, Translations to be provided by Dlearn, FSFE, and SKUNI in K:\team\foss4smes\2. Implementation\Outputs\Output 1\A2\O1.A2. Summary translations by 01.09.19.
O3/A1 executive summary translation: Dlearn, FSFE, ATL and SKUNI by 01.09.19. in folder K:\team\foss4smes\2. Implementation\Outputs\Output 3\A1\Translated executive summaries
Timesheets 07-09.19: All by 20.9.
_____
[KT1] <> to be able to provide contacts for the stakeholders matrix) we stress the importance of providing content for use under usage scenario 3
[KT2] <> We were working on this in conjunction with our multiplier event so I will get a list from our internal admin
Thank you all for our cooperation. Please remember to inform me on your summer leave. I will be away 01-20.08.19, but will have access to all communication channels we use.
Best,
Katerina